V1 Torhout

Preliminary Report-Full report later.

Situation on September 26 2005.

Build near the end of August 1944, this planned V1 launch site was never operational.
Only a concrete road and a launch support structure is still visible.

German left over of the concrete road.

Launch plate and first concrete support block.

_

Launch direction: Compass measurement is 282°

Distance between each pair of blocks is about 5m.

 home

blog stats



www.000webhost.com